Ar/projects

66/15 KV Existing substation expansion

Location: CHAD/ N'DJAMENA, LAMADJI SUBSTATION

Client: Green Source Investments

End User: Société Nationale d'Électricité (Chad National Electricity Company)

Project Date: 2026

Scope of Work:

Civil, Electro-Mechanical works and Testing &Commissioning for Substation Bay.

Ma’an Project 50 MWp PV Plant

Location: Jordan, Ma'an

Client: Green Source Investments

End User: General Intelligence Department

Project Date: 2026

Scope of Work:

Solar PV plant Piling works, Electromechanical installation supervision and testing & commissioning.

Noor Chad 50 MWp PV Plant and 66kV Substation

Location: TCHAD, N'Djamena

Client: Green Source Investments

End User: MASDAR-GSU

Project Date: 2026

Scope of Work:

66kV Substation / Solar PV plant (Piling works), Electromechanical installation supervision and testing & commissioning.

90KV EXISTING SUBSTATION UPGRADE

Location: TCHAD/ N'DJAMENA

Client: Green Source Investments

End User: Chad Electricity

Project Date: 2026

Scope of Work:

The works include Civil , Electro-Mechanical works and Testing & Commissioning for substation Bay.

50MWP SOLAR PV PLANT

Location: Central Africa

Client: Green Source Investments

End User: MASDAR-GSU

Project Date: 2026

Scope of Work:

110kV Substation / Solar PV plant (Piling works), Electromechanical installation and testing & commissioning.

Upgrading 66KV Existing substation

Location: TCHAD, N'Djamena

Client: Green Source Investments

End User: MASDAR-GSU

Project Date: 2025

Scope of Work:

66kV Substation / Solar PV plant (Piling works), Electromechanical installation supervision and testing & commissioning.

Phosphate Project

Location: Jordan, Al-Karak

Client: Jordan Phosphate Mines Co JPMC

End User: Jordan Phosphate Mines Co JPMC

Project Date: 2024

Scope of Work:

Civil rehabilitation for two substations and engineering, supply and installation of steel structural warehouse.

Al-Balqa Applied University PV Plant LV & M, T&C

Location: Jordan, Salt

Client: Kawar Energy

End User: Al-Balqa Applied University

Project Date: 2023

Scope of Work:

Testing and Commissioning of all the MV and LV sides, including but not limited to:
PV Modules, Inverters, cables, transformers, and Switchgears

KOSPO – HRSG #1 & HRSG #2 Chemical Cleaning -POWER PLANT

Location: Jordan , Al-Karak

Client: KOSPO

End User: KOSPO

Project Date: 2023

Scope of Work:

Participate in the shutdown activities by conducting chemical cleaning for Plant HRSGs.

Mutah University PV solar power plant (5 MWp)

Location: Jordan, Al-Karak

Client: Al-Mazar Contracting Company

End User: Mutah University

Project Date: 2022

Scope of Work:

Installation the steel structure for 5Mw PV system at Mutah University with all electrical work.

CEGCO Power Plant-Root Cause Analysis

Location: Jordan, Zarqa Power Plant

Client: CEGCO

End User: AQWA

Project Date: 2022

Scope of Work:

Supply Services to Carry Out RCA Testing Pipe Failure

24MWp PV Solar Testing & Commissioning

Location: Jordan, DISI

Client: SEPCO-III

End User: Ministry of Water

Project Date: 2022

Scope of Work:

Testing of :
MV Grid Cable Testing.
Testing of All- PV Plant Harnesses (2,200 Nos.)

400 KV Attarat AIS substation- Electromechanical works, T&C.

Location: Jordan, Qatraneh

Client: Hyosung Heavy Industrial Corporation

End User: NEPCO

Project Date: 2021

Scope of Work:

Mechanical, Electrical installation & testing & commission works.

Mansourah, Masarrah gold project- Solar Power Plant

Location: KSA, South Riyadh

Client: Larsen & Toubro Limited

End User: Maaden

Project Date: 2021

Scope of Work:

Electromechanical installation, including but not limited to:
– 19440 Modules / 486 Tables
– 120 SMA 50W Inverters
– 40 Km Of Different Types Of Cables Laying And Termination

NADEC PV solar power plant (30 MWp)

Location: KSA, NADEC city, HARAD

Client: Engie Solar Saudi for Construction

End User: NADEC

Project Date: 2021

Scope of Work:

Mechanical installation including PV modules and single-axis tracker for 8 MWp.

Cleaning of 6MWp PV solar plant

Location: Jordan, Amman

Client: MILLENNIUM Industrial Services

End User: Marriott and Sheraton Hotel

Project Date: 2021

Scope of Work:

Wet & Dry Module Cleaning

Supervision of PV project for the French Embassy in Amman

Location: Jordan, Amman

Client: French Embassy

End User: French Embassy

Project Date: 2021

Scope of Work:

Consultancy service including review drawings, inspect materials, supervision of installation and commissioning

Marriot & Sheraton Solar PV Plant T&C

Location: Jordan, Amman and Al-Damkhi

Client: Marriot & Sheraton Solar Energy

End User: Marriott and Sheraton Hotel

Project Date: 2020

Scope of Work:

Testing and Commissioning, including the MV side to the point of common coupling and LV side form the PV module to the LV side of the inverters.

Al-Hazaa PV Solar Plant (16.5MWp)

Location: Jordan, Al -Jiza

Client: Al-Hazaa for Generating RE Company

End User: AL-Hazaa Investment

Project Date: 2019

Scope of Work:

Testing and Commissioning of all the MV cables , transformers, and Switchgears

Design, Supply, Install, Testing, and Commissioning Dispensary

Location: Jordan, Ajloun

Client: Cowater Sogema

End User: Government Schools

Project Date: 2019

Scope of Work:

Design, Supply, Install, Testing, and Commissioning 4 Schools & Dispensary

PV plant rehabilitation for Marriott and Sheraton

Location: Jordan, Amman

Client: Al- Rukh Construction Company

End User: Marriott and Sheraton Hotel

Project Date: 2019

Scope of Work:

PV Plant affected by serve weather conditions caused huge damage to the PV modules, structural, cables, etc. plant components.

Testing and commissioning for Six MV – Substation

Location: Jordan, Amman

Client: ULUSOY ELECTRIK / ABB

End User: EDCO

Project Date: 2018

Scope of Work:

Testing and commissioning for Six MV – Substation

EPC Work for – Al-Kharras Industrial Corp. Ltd. Factory

Location: Jordan, Amman

Client: AL Kharras Industrial Corp. Ltd

End User: ULUSOY ELECTRIK/ABB

Project Date: 2017

Scope of Work:

Completed EPC, testing and commissioning for 166.7 kW