66 MWP SOLAR PV PROJECT AT MAAN / JORDAN
Piling works, Electromechanical installation supervision and testing& commissioning

NOOR CHAD SUBSTATION PROJECT
Electromechanical works , Tesing and commissioning for 33/66KV Substaion project.

120MWP OPERATION & MAINTENANCE CONTRACT AT ADEN / YEMEN
Coduct operation & Maintenance for 120MWp PV plant including the monthly and yearly monthly performance reports.

50MWP SOLAR PV PROJECT AT N’DJAMEN
Piling works , electromechanical installation supervision and testing & commissioning

RE-HABILITATION OF TWO SUBSTATIONS / JORDAN PHOSPHATE MINE’S / SOUTH OF JORDAN
Civil rehabilitation for two substations and engineering – supply and installation of steel structural warehousw

CONDUCTING PULL OUT FOR TWO SOLAR PLANTS AT AL-AIN / UAE
This works include pile ramming, and conducing vertical compression and horizontal pull out and issue the pull out test report.

ADEN PV PLANT POWER PLANT (120MWP)
Project Summary: Al Jabir has been awarded the contract for project management, pile drilling using our own drilling machines, and testing and commissioning.


التنظيف الكيميائي الجانبي من HRSGs HP – شركة كوريا الجنوبية للطاقة المحدودة/الأردن ذ.م.م
أعمال انهاء واختبار وتشغيل كابلات محطة الحسينية المتوسطة الجهد 66 ميجاوات
العطارات – محطة فرعية جهد 400 ك.ف للأعمال الكهروميكانيكية
أعمال الاختبار والتشغيل لمحطة كهرباء يقدرة 16 ميجاوات في مدينة هازا
مدارس كو ووتر - EPC محطة الطاقة الشمسية الكهروضوئية
أعمال تشغيل و فحص لمحطتي فنادق الماريوت و الشيراتون بقدرة 11 ميجاوات
أعمال تنصيب ميكانيكية لجامعة مؤتة بقدرة 5 ميجاوات
أعمال تنظيف خلايا الطاقة الشمسية لفنادق الماريوت و الشيراتون بقدرة 11 ميجاوات
العراق – اختبار شركة جنرال إلكتريك وتشغيل المنصة الكيميائية (FOTP)
تشغيل مجموعة المفاتيح الكهربائية ذات الجهد المتوسط في 7 محطات فرعية
نادك – مشروع الطاقة الشمسية الكهروضوئية بقدرة 8 ميجاوات
زولوم – مشروع الطاقة الشمسية الكهروضوئية بقدرة 10 ميجاوات
































