66 MWP SOLAR PV PROJECT AT MAAN / JORDAN
Piling works, Electromechanical installation supervision and testing& commissioning

NOOR CHAD SUBSTATION PROJECT
Electromechanical works , Tesing and commissioning for 33/66KV Substaion project.

120MWP OPERATION & MAINTENANCE CONTRACT AT ADEN / YEMEN
Coduct operation & Maintenance for 120MWp PV plant including the monthly and yearly monthly performance reports.

50MWP SOLAR PV PROJECT AT N’DJAMEN
Piling works , electromechanical installation supervision and testing & commissioning

RE-HABILITATION OF TWO SUBSTATIONS / JORDAN PHOSPHATE MINE’S / SOUTH OF JORDAN
Civil rehabilitation for two substations and engineering – supply and installation of steel structural warehousw

CONDUCTING PULL OUT FOR TWO SOLAR PLANTS AT AL-AIN / UAE
This works include pile ramming, and conducing vertical compression and horizontal pull out and issue the pull out test report.

ADEN PV PLANT POWER PLANT (120MWP)
Project Summary: Al Jabir has been awarded the contract for project management, pile drilling using our own drilling machines, and testing and commissioning.


HRSGs HP Side Chemical Cleaning – Korea Southern Power Co., Ltd./Jordan L.L.C
66MWP-Hussainyah MV cable termination & testing and commissioning works
Attarat – 400 KV substation for Electromechanical works
16MWP – Haza Testing and commissioning work
Co-water Schools EPC Solar PV plant
11MWP – Marriott & Sheraton Testing & Commissioning
5MWP Moutah Mechanical installation
11MW – Marriott & Sheraton PV cleaning
Iraq – GE testing & commissioning of Chemical Skid (FOTP)
Commissioning of MV switchgear at 7 substations
NADEC – 8 MWP SOLAR PV PROJECT
Zulum – 10 MW SOLAR PV PROJECT